Muhammad Irfan Mechanical Engineer
Muhammad Irfan
Mechanical Engineer with 05 years in EPC Projects
with EPC and EPCM companies in power generation
and Oil and Gas sector.
Mobile +whatsapp : 0532408904
Email: engrirfan4480@[Link]
OBJECTIVE
To achieve highly challenging position in your esteemed organization for Piping,
Welding, Materials, and Mechanical Static Equipment’s, Piping Fabrication, Erection,
Inspection of which will enhance my ability and skills.
To provide highly satisfactory and creditable service to the organization, where I can
make timely decisions for the betterment of the company to grow along with it.
Multitasking skills, with an ability to perform a task within deadlines, a target-oriented
& self- motivated personality, financial & resource management skills, risk assessments
techniques, planning regulations, effective problem-solving techniques, can handle
stress in field & site supervision, stewardship & time management
CORE COMPETENICES
Projects Engineering
Project conceptualization and feasibility studies.
Providing necessary engineering services i.e., Engineering & Design,Sizing & Selection of
various elements/ Equipment’s, Interfacing of various equipment’s & systems etc. for
execution of projects.
Liaising with clients & providing field engineering support during construction for oil &
gas and power generation related projects.
Preparing Specifications for various parts of the plant.
Over viewing Materials Group for following up with vendors for getting the materials & equipment in
time, replacement, etc.
Project Planning & Execution
Anchoring on-site activities to ensure completion of project within the time & cost
parameters and effective resource utilization to maximize the output.
Perform EPC projects and having vast experience of all disciplines like Engineering,
Procurement, Structural works, Foundations, Scaffolding, Fencing, heavy lifting, Jacking
and skidding of heavy Equipment’s, Piping fabrication & erection, Structure Fabrication,
Installation, Boiler and Stack replacement, Installation of Equipment’s, energization of
systems, E&I works (Cable laying, Cable tray installation, Instruments hooks up,
Switchgear, diesel end gas based generators installation, .) Pre- commissioning and
commissioning of mechanical and E & I systems).
Experience of Mega Turnaround/ shutdowns (Maintenance of Exchanger, fin fan
Coolers, Columns, Vessels, sump tanks, Valves), Predictive & Preventive maintenance
(PSV, PVRV, strainer, lubrication/greasing of pump, motor, bearing, Alignment of rotary
equipment.
Quality Assurance
Ensuring compliance of standards and statutory regulations.
Preparing quality assurance plans for bought out equipment’s and for site works/
erection.
Conversant with ASME/API/AWS/ISO standards.
Possess strong communication, analytical and problem resolution. Well versed with
international
HSE standards and their implementation, Quality standards and their implementation in
the due course of the projects.
EDUCATION
Bachelor of Engineering (Mechanical) from THE UNIVERSITY OF LAHORE (ISLAMABAD
CAMPUS) ISLAMABAD PAKITAN
Registered as a Professional Engineer (PE) from Higher Education Commission and
Pakistan Engineering Council.
ADDITIONAL SKILLS
Well experience in SAP and ERP.
Knowledge of Design Software AUTOCAD. Well acquainted
with MS PROJECT & MS OFFICE.
Employment Profile : 05 YEAR’S
01 SICIM SPA –Kingdome of Saudi Arabia
Duration: 1/9/2023 to till date
Designation: Project engineer
Client: SWCC & SAUDI ARAMCO
Contractor: JV (ASG & SICIM)
Project description:
Project cost 448 Million SAR
Process piping 38000 Dia-Inch
Structure fabrication 560 Ton
Equipment fabrication 840 Ton
It’s an EPC Project and Sicim has to do Engineering, procurement and construction of Yanbu Gas
Pipeline Project Phase-III which is under SWCC Client and purpose of this project is to supply fuel gas
to SWCC Power and Desalination Plant at Yanbu 3, Al-Madinah Province, KSA. The Ministry of Energy
allocated 640 MMSCFD based on the HV of 1080BTU/SCF of sales gas to SWCC. The Sales Gas
Delivery System is defined as all pipeline, piping, valves, instrumentation, filtration and custody
transfer metering skid, electrical equipment, communications and any other necessary facilities to
transport Sales Gas from SAUDI ARAMCO Primary Industrial Sales Gas Supply Pipeline header (KP-
19) to SWCC Phase-3 facilities. The Project has 5 main working areas as follows. Tie-in Launcher Area
at KP-19, Sectionalizing Valve Station, Receiver, Pipeline and plant scope area.
Job Roles & Responsibilities:
To provide leadership in developing, communicating, reviewing, organizing, and
preparing work scope, detailed work plan, and workable Maintenance schedule
Review engineering deliverables including piping plan, PIDs, Isometrics , structure
fabrication drawings etc.
Preparation of packages and technical evaluation of the package with vendor to handle
the job safely within the time line.
Monitor, review and updates turnaround scheduled activities and third party
documents during execution safely, efficiently, and effectively.
Planning for overall Project schedule monitoring / coordination with client, consultant
and other contractor’s / logistics activities, implementing effective techniques to bring
efficiency in operations, improving quality standards & achieving cost savings
Maintain the quality of work as per defined project quality plan to mitigate the reworks.
Monitor progress of the work assigned on daily basis by utilizing Systems generated
reports in order to ensure timely completion of the discipline work.
Make sure that all required work permits are obtained in time and that the team
understands and follows the conditions of the permit, in order to avoid any subsequent
problems and conflicts.
.
Been pivotal in supervising the construction site all piping related works and
accountable for planning and scheduling of all activities at site particularly piping
erection.
Handled all aspects of construction such as piping, installation & static/rotting
equipment’s, pre- commissioning including pipe works modification inspection, hydro
testing and welding works, test package preparations and acceptance, chemical
cleaning of equipment’s, lay-up/air blowing of lines pressure testing and controlling all
disciplines including welding progress.
Was accountable for monitoring fabrication & installation of different diameters of
piping and pipelines according to packages.
Demonstrated abilities in preparing daily, weekly and monthly progress and
accomplishment reports for all piping activities. Monitor/ track status of work output
on daily, weekly and monthly basis for early completion of the project. Check project
specifications are followed to avoid reworks on the scheduled work activities.
Prepares construction-piping works requiring fabrication of standard construction
piping techniques and procedures is carrying out a sequence of related piping task.
Reviewing the engineering new tools and work methods of improvements purposes.
Supervises safety delivery of physical design, construction ensuring cost efficiency and
quality objectives.
Providing direction, decision as delegated and leadership to peers within contractor and
project division insuring timely and cost efficiency.
Identifying the operational need and lead in the creation of teams and operation of
technical performance audits of work program, produced by others for our organization
and ensure proper recommendation are made and carried out to correct technical and
safety errors in the design and construction process.
Preparing defect / fault / failure statistics, checks of personnel assignment; review to
determine whether the required supervisory and quality assurance staff are present
during all activities.
Conducting of weekly progress meetings with suppliers, erection companies and client’s
site management, and even more frequently if needed.
Looked into the review of required QA/QC documents for fabrication and erection
works, quality inspection plan, welding procedure specifications, process qualification
records and non-destructive testing procedures; procedures for pressure and leak
testing, repairs and modifications.
02 SENDAN International Ltd, KSA
Duration: 2021 to2022
Designation: Site Engineer
[Link] of Utility Boilers in Berri Gas Plant, Jubail, KSA
Saudi Aramco awarded Replace Utility Packaged Boilers at BGP Project to JGC Gulf International .
Project work involved Replace Utility Packaged Boilers having weight was 500 Ton of each HP Boiler
which Sendan installed through specialized Rigging Company Mammoet with the help of skidding and
jacking along with economizer, stack, FD Fan, Piping, Structure, Mechanical, Civil, Electrical &
Instrumentation work at BGP Project. Demolition of 2 x LP Boilers (476-F-1A/B), 2 x HP Boilers (476-
F2A/B) and Installation of 2 x New HP Boilers (476-F-1001 & 1002).
JGC sub-contracted to Sendan all site equipment demolition & erection, piping & steel structure
fabrication & erection, civil foundation work, electrical & instrumentation work. Peak manpower was
350 no’s
[Link] RO Plant Installation with Flour EPC Contractor
This Project awarded by SADARA /DOW to Flour EPC Company then Flour awarded the Constructing
scope to Sendan. Scope was covering the Mechanical, Piping and E & I scope. Civil foundation was
also part of scope. Project worth was 36 Million and project span was
11 months and peak manpower was 380. Project bottlenecks was Construction of all activities in one
place so it was a difficult task to complete the task on time because crashing technique was not also
possible to attain the Progress. Anyhow due to esteem support of Director and higher management
technical support, Sendan completed RO plant installation Project within timeframe.
Due to this achievement, Sendan having is performing a lot of Construction activities in Sadara
KEY RESPONSIBILITIES
Review engineering deliverables including PFD, PIDs, Isometrics, GA drawings
etc.
Maintain the quality of work as per defined project quality plan to mitigate the
reworks.
Monitor progress of the work assigned on daily basis by utilizing Systems
generated reports in order to ensure the timely completion of the discipline
work.
Make sure that all required work permits are obtained in time and that the
team understands and follows the conditions of the permit, in order to avoid
any subsequent problems and conflicts.
Piping Fabrication and erection, NDT, Hydro testing, demolishing works,
equipment installation etc. have been taken care of in advance, in order to
execute the work according to the plan.
Responsibilities include monitoring and inspection according to the inspection
and test plan for the entire equipment erection and installation at the Steam
Boiler, Heater’s, Radiant, Convection and breeching module, Radiant Coil,
Primary and Secondary Quench exchanger, Steam drum, Heat exchanger, vessel,
Column’s, Pumps and Compressors, Lube oil and Fuel skid.
Ensuring the works are performed in accordance with the
specifications/method statement and inspection and test plan procedure.
Ensuring implementation of Quality Control plan, Procedure and inspection & Test
plan. Equipment internal inspection.
Inspection of preliminary coupling alignment (Rotary Equipment).
Ensuring the shims is in accordance with codes and standards.
Documentation approval for grouting.
Documentation approval for solo run and other activities.
Inspection of foundation, pad plate, anchor bolt projections are in accordance
with client’s specification
03 Bestway cement limited Ltd power plant modification-pakistan
Duration: 05/04/2019 to 5/8/2022
Designation: Site engineer
Client: Bestway cement limited
Contractor: Descon engineering limited
Project description:
Best way cement limited decided to to increase the capacity of cement plant by adding a new
cement production line and also decide to modify the steam turbine condensing system from water
cool condenser to air cool condenser (ACC i.e air cool condensing system).
Project cost 400 Million pkr
Process piping 25430 Dia-Inch
Structure fabrication 1600 Ton
Equipment fabrication 750 Ton
Job Roles & Responsibilities:
Monitor, review and updates turnaround scheduled activities
and third party documents during execution safely, efficiently, and effectively.
Planning for overall Project schedule monitoring / coordination with client, consultant
and other contractor’s / logistics activities, implementing effective techniques to bring
efficiency in operations, improving quality standards & achieving cost savings
Make sure that all required work permits are obtained in time and that the team
understands and follows the conditions of the permit, in order to avoid any subsequent
problems and conflicts.
Piping construction activities of Bestway cement Limited up gradation project, including
Air cool condensing system , waste heat boilers installation, Steam
Generation System modification, Power Plant modification , Sour Water, Compressed
air system, cooling water system and Utility .
Handled all aspects of construction such as piping, installation & static/rotting
equipment’s, pre- commissioning including pipe works modification inspection, hydro
testing and welding works, test package preparations and acceptance, chemical
cleaning of equipment’s, steam lines/lay-up/air blowing of lines pressure testing and
controlling all disciplines including welding progress.
Was accountable for monitoring fabrication & installation of different diameters of
piping and pipelines according to packages.
Demonstrated abilities in preparing daily, weekly and monthly progress and
accomplishment reports for all piping activities. Monitor/ track status of work output
on daily, weekly and monthly basis for early completion of the project. Check project
specifications are followed to avoid reworks on the scheduled work activities.
Prepares construction-piping works requiring fabrication of standard construction
piping techniques and procedures is carrying out a sequence of related piping task.
Reviewing the engineering new tools and work methods of improvements purposes.
Supervises safety delivery of physical design, construction ensuring cost efficiency and
quality objectives.
Identifying the operational need and lead in the creation of teams and operation of
technical performance audits of work program, produced by others for our organization
and insure proper recommendation are made and carried out to correct technical and
safety errors in the design and construction process.
Preparing defect / fault / failure statistics, checks of personnel assignment; review to
determine whether the required supervisory and quality assurance staff are present
during all activities.
Conducting of weekly progress meetings with suppliers, erection companies and client’s
site management, and even more frequently if needed.
Looked into the review of required QA/QC documents for fabrication and erection
works, quality inspection plan, welding procedure specifications, process qualification
records and non-destructive testing procedures; procedures for pressure and leak
testing, repairs and modifications.
04 Crescent Power limited erection and commissioning =PAKISTAN
Duration: JUN 2020 to JUN 2021
Designation: Site engineer
Client: crescent power limited Contractor: EKL
engineering limited Project description:
cresent power limited decided for erection of a new 60 mw HFO and diesel based power plant
power with 10 units of wartisila 18v32ln (each capacity 6MW) with complete set up [Link]
tanks ,lube oil tanks, air vessels, compressors, pumps ,fuel oil purifiers, lube oil purifiers, heat
exchangers ,cooling towers, air filtration system and 8 ton Heat recovery steam generator (HRSG)
Project cost 550 Million pkr
Process piping 36430 Dia-Inch
Structure fabrication 1450 Ton
Equipment fabrication 930 Ton
Job Roles & Responsibilities:
Piping Fabrication and erection, NDT, Hydro testing, demolishing works, equipment
installation etc. have been taken care of in advance, in order to execute the work
according to the plan.
Responsibilities include monitoring and inspection according to the inspection and test
plan for the entire equipment erection and installation.
Ensuring the works are performed in accordance with the specifications/method
statement and inspection and test plan procedure.
Ensuring implementation of Quality Control plan, Procedure and inspection & Test plan.
Inspection of foundation, pad plate, anchor bolt projections are in accordance with
client’s specification and respected drawing.
Ensuring the shims is in accordance with codes and standards.
Documentation approval for solo run and other activities.
installation execution of all static and rotating Equipment’s - Heat Exchangers, Columns,
Pressure Vessels, Heaters ,purifiers, cooling towers ,Boilers, Tanks, piping etc.
and fabrication of pipelines Piping prefabrication including pipe supports, piping
erections including pipe supports, spool pieces control, check and monitor tools,
equipment and welding consumables, check and monitor pipe internal cleaning for
small bore and large bore.
Piping Erection, Welding, Complete assembly of all the lines, Performing hydro test,
Rein statement of lines, Approval by Client’s Piping Inspector and Releasing for Pre-
commissioning.
Providing all work points with scaffolds, riggers and adequate cranes used for the lifting-
up of all spool- pipes or big valves at the desired location.
Witness and supervise all pre-job inspection activities relate to service contractors
equipment.
Work pack preparation for jobs as per the job list.
Prepare maintenance programs to ensure technical integrity, safe/reliable Operation
and maximum availability.
Participated in shutdown & Turnaround activities along with time scheduling plan for
project under execution.
Preparing Method Statement for different type of Jobs.
Prepared schedule jobs, compile and distribute for validation, review day today basis.
Identification of spares requirement for various mechanical equipment, tools & tackles
& consumable.
05 Sitara Energy Limited Pakistan power plant extension
Duration 2019 to 2020
Designation: Site engineer
Project description: 24MW power plant extension project
Client: Sitara Energy limited
Contractor: Mass com limited
Project description: Sitara energy limited decided for extend of a new 26 mw HFO and diesel
based power plant power with 4 units of niggata 18v32 (each capacity 6.5MW) with complete set
up [Link] tanks ,lube oil tanks, air vessels, compressors, pumps ,fuel oil purifiers, lube oil purifiers,
heat exchangers ,cooling towers, air filtration system.
Project cost 2,10 Million pkr
Process piping 19430 Dia-Inch
Structure fabrication 960 Ton
Equipment fabrication 430 Ton
Job Roles & Responsibilities:
o Handled all aspects of construction such as engine Installation, piping,
installation & static/rotting equipment’s, pre- commissioning including pipe
works modification inspection, hydro testing and welding works, test package
preparations and acceptance, chemical cleaning of equipment’s, steam
lines/lay-up/air blowing of lines pressure testing and controlling all disciplines
including welding progress.
o installation execution of all Equipment’s - Heat Exchangers, Columns, Pressure
Vessels, Heaters ,purifiers, cooling towers ,Boilers, Tanks, piping etc. and
fabrication of pipelines.
o Demonstrated abilities in preparing daily, weekly and monthly progress and
accomplishment reports for all
o piping activities. Monitor/ track status of work output on daily, weekly and
monthly basis for early completion of the
o project. Check project specifications are followed to avoid reworks on the
scheduled work activities.
o Supervising projects to ensure that the projects are completed within defined
timeframe and executed as per quality standards.
o Playing a key role in checking the project specifications are followed to avoid
reworks on the scheduled work activities. Implementing effective quality
improvement programs.
o Direct the project design team in the preparation of construction documents,
specifications, and project contract scope of work.
o Lead the project permits and approval process and coordinated with involved
groups and review staff
o Managed the project close out and hand over of completed project to Bureau
staff and provided follow-up actions as required during the warranty period. o
Deliver technical output in accordance with project safety, time, cost and quality
compliance.
o Monitored contractor schedule and quality and requested corrective action
where required.
o Recommended changes in designs, specifications and schedules to
accommodate conditions at construction site or to expedite construction.
o Developed engineering standards, specifications, engineering practices and
procedures for maintenance, repair and turnaround of plant equipment.
o Implemented computerized maintenance management system (CMMS) for
scheduling and execution of preventative and predictive maintenance to
improve equipment reliability.
o Conducted failure analysis of mechanical failures as well as unexpected
maintenance problems and operational problems related to equipment.
o procurement of new equipment, equipment spare parts, troubleshooting and
repair as well as for the installation and improvement.
o Provided training to the technical specialists and operators on the equipment’s
maintenance and operation.
Personal Details
Passport No XX1177611
Current Address: Yanbu-Almadina Industrial City, Kingdom of Saudi Arabia
Cell No.: +966532408904
Email Address: engrirfan4480@[Link]
Date of Birth: 28 May 1990
Iqama No.: 2572239925
Iqama validation JULY 2025
Marital Status Married
Nationality Pakistani
Father’s Name ABDUL KARIM