HIRA
HIRA
0-01
OPERATION OHSMS CATEGORY: Operation Control
DIVISION
DEPARTMENT
SECTION
Hazard Identification & Risk Assessment [Safety] ISSUE NO:
ISSUE DATE:
REVISION NO.:
0
28-Mar-22
0
REVISION DATE:
Deptt. / Section
HIRA Sheet Line / Process name
OHSMS Coordinator Manager Chief Manager / General OHSMS Secretariat
[Section Head] Safety PIC Manager
Prepared By Checked By Reviewed By Approved By Issued By
OK
1 Canteen Renovation 1. Grinding wheel gaurd
need to be fixed. Acceptable
2. Grinding / Cutting to be
done by authorized person.
3. Fire Blanket need to be
Grinder will be used to
Fire
cut False Ceiling angles
used wherever flammble II c C 4. Wear face mask at all times III d E
material not removed like
duct insulation.
4. Ensure No flammbale
material to be kept near by
work area.
1. Daily Aawarness
Associate wear safety regarding uses of Proper
Sharp Edge gloves while handling of PPEs in proper manner II c C 5. Use ear plugs and hand gloves III d E
angles imparted during tool Box
talk
Skilled Mason
Area Barricade
Wall break from top to Sudden fall of Beam or No movement allowed in restricted area
Dismantling using hilting Safety Googles, Safety Shoes and Gloves required
Dismantling of bricks & RCC lintels Fall of Constructed Beam or Wall bottom direction by Bricks which may injured
machine Continous Supervsion requiredby site Engg.
using Hiliti. to associate
Use of Sacaffold and other Height work permit requirement
if work will execute at height.
1.Dust can get into eyes, 1. Barrication of work area; Authorised manpower only;
1. Dust
nose, mouth
II c C Wear face mask and goggles at all times
III d E
2. Cut Injury 2. Cut Injury II c C 2. Provide all proper PPEs (hand gloves etc.) III d E
On site wood work for OK
5 Wood Work Wood work for canteen interior Temporary Daily after work start Area is clear
furniture, interior etc. Acceptable
3. Eye injury 3. Eye injury II c C 3. Use safety goggles III d E
1. Cut injury 1. Cut injury II c C 1. Barrication of work area; Authorised manpoer only III d E
Existing windows, doors
dismantling and new Galss material in area.
Dismantling/ Installation of 2. Wear face mask, hand gloves, safety shoes at all times; OK
7 Glass Work window, doors Temporary Daily after work start 2. Foot/Hand injury Fragile and prone to 2. Foot/Hand injury II c C III d E
windows, doors & partition work Provide all proper PPEs Acceptable
installation, glass breaking
partition work
3. Use Safety Goggles; Work Instructions to be given in daily
3. Eye injury 3. Eye injury II c C KYT meeting
III d E
4. Damage to material/
4. Fall injury
property
II c C 4. Work Instructions to be given in daily KYT meeting III d E
1. Barrication of work area; Authorised manpoer only;
1. Dust 1. Foot/Hand injury II c C Provide all proper PPEs
III d E
4. Damage to material/
4. Fall injury
property
II c C 4. Work Instructions to be given in daily KYT meeting III d E
4. MSD (in manual lifting) 4. MSD (in manual lifting) II b B 4. Avoid manual lifting if possible. Use trolley instead III c D
PLANT/HO/RO/ZO CONTROL NO.: OHSMS-6.1.2-OC-CS-F0-1.0-01
HIRA Sheet
Deptt. / Section Line / Process name
Manager Chief Manager / General
OHSMS Coordinator [Section Head] Safety PIC Manager OHSMS Secretariat
2. Slip & Trip 2. Injury by Slip & Trip II c C 2. Provide all proper PPEs - Helmet, Safety belt, Hand III d E
1. Foot injury while construction 1. Foot injury while 1. Use gum boots and hand gloves; Barrication of work area;
work construction work
II b B Authorised manpower only
III c D
2. Injury in hands 2. Injury in hands II b B 2. Use hand gloves at all times III c D
Construct wall, beam & column, Partition of admin office OK
2 Construction Work Routine Daily Area is clear
etc. in respective area Acceptable
3. Dust 3. Dust II b B 3. Wear face mask III c D
RCC Casting of Floor, Foundation RCC Casting of Floor, 2. Use hand gloves aand other proper PPEs; Work OK
3 Casting Work Non Routine 3-4 times a week 2. Injury in hands Area is clear 2. Injury in hands III c D IV d E
etc. Foundation etc. Instructions to be given in daily KYT meeting Acceptable
1.Dust can get into eyes, 1. Barrication of work area; Authorised manpower only;
1. Dust
nose, mouth
II c C Wear face mask and goggles at all times
III d E
2. Cut Injury 2. Cut Injury II c C 2. Provide all proper PPEs (hand gloves etc.) III d E
On site wood work for OK
5 Wood Work Wood work for canteen interior Temporary Daily after work start Area is clear
furniture, interior etc. Acceptable
3. Eye injury 3. Eye injury II c C 3. Use safety goggles III d E
1. Cut injury 1. Cut injury II c C 1. Barrication of work area; Authorised manpoer only III d E
Existing windows, doors
dismantling and new Galss material in area.
Dismantling/ Installation of 2. Wear face mask, hand gloves, safety shoes at all times; OK
7 Glass Work window, doors Temporary Daily after work start 2. Foot/Hand injury Fragile and prone to 2. Foot/Hand injury II c C III d E
windows, doors & partition work Provide all proper PPEs Acceptable
installation, glass breaking
partition work
3. Use Safety Goggles; Work Instructions to be given in daily
3. Eye injury 3. Eye injury II c C KYT meeting
III d E
4. Damage to material/
4. Fall injury
property
II c C 4. Work Instructions to be given in daily KYT meeting III d E
4. Damage to material/
4. Fall injury
property
II c C 4. Work Instructions to be given in daily KYT meeting III d E
4. MSD (in manual lifting) 4. MSD (in manual lifting) II b B 4. Avoid manual lifting if possible. Use trolley instead III c D
PLANT/HO/RO/ZO CONTROL NO.: OHSMS-6.1.2-OC-CS-F0-1.0-01
HIRA Sheet
Deptt. / Section Line / Process name
Manager Chief Manager / General
OHSMS Coordinator [Section Head] Safety PIC Manager OHSMS Secretariat
1. Fall of structure / material / 1. Fall of structure / 1. Authorised manpoer only; Barrication of work area; make
tools material / tools
II c C SOP of work and give instruction in KYT Meeting
III d E
2. Slip & Trip 2. Injury by Slip & Trip II c C 2. Provide all proper PPEs - Helmet, Safety belt, Hand III d E
1. Foot injury while construction 1. Foot injury while 1. Use gum boots and hand gloves; Barrication of work area;
work construction work
II b B Authorised manpower only
III c D
2. Injury in hands 2. Injury in hands II b B 2. Use hand gloves at all times III c D
Construct wall, beam & column, Partition of admin office OK
2 Construction Work Routine Daily Area is clear
etc. in respective area Acceptable
3. Dust 3. Dust II b B 3. Wear face mask III c D
RCC Casting of Floor, Foundation RCC Casting of Floor, 2. Use hand gloves aand other proper PPEs; Work OK
3 Casting Work Non Routine 3-4 times a week 2. Injury in hands Area is clear 2. Injury in hands III c D IV d E
etc. Foundation etc. Instructions to be given in daily KYT meeting Acceptable
1.Dust can get into eyes, 1. Barrication of work area; Authorised manpower only;
1. Dust
nose, mouth
II c C Wear face mask and goggles at all times
III d E
2. Cut Injury 2. Cut Injury II c C 2. Provide all proper PPEs (hand gloves etc.) III d E
On site wood work for OK
5 Wood Work Wood work for canteen interior Temporary Daily after work start Area is clear
furniture, interior etc. Acceptable
3. Eye injury 3. Eye injury II c C 3. Use safety goggles III d E
1. Cut injury 1. Cut injury II c C 1. Barrication of work area; Authorised manpoer only III d E
Existing windows, doors
dismantling and new Galss material in area.
Dismantling/ Installation of 2. Wear face mask, hand gloves, safety shoes at all times; OK
7 Glass Work window, doors Temporary Daily after work start 2. Foot/Hand injury Fragile and prone to 2. Foot/Hand injury II c C III d E
windows, doors & partition work Provide all proper PPEs Acceptable
installation, glass breaking
partition work
3. Use Safety Goggles; Work Instructions to be given in daily
3. Eye injury 3. Eye injury II c C KYT meeting
III d E
4. Damage to material/
4. Fall injury
property
II c C 4. Work Instructions to be given in daily KYT meeting III d E
4. MSD (in manual lifting) 4. MSD (in manual lifting) II b B 4. Avoid manual lifting if possible. Use trolley instead III c D
PLANT/HO/RO/ZO CONTROL NO.: OHSMS-6.1.2-OC-CS-F0-1.0-01
HIRA Sheet
Deptt. / Section Line / Process name
Manager Chief Manager / General
OHSMS Coordinator [Section Head] Safety PIC Manager OHSMS Secretariat
1. Fall of structure / material / 1. Fall of structure / 1. Authorised manpoer only; Barrication of work area; make
tools material / tools
II c C SOP of work and give instruction in KYT Meeting
III d E
2. Slip & Trip 2. Injury by Slip & Trip II c C 2. Provide all proper PPEs - Helmet, Safety belt, Hand III d E
1. Foot injury while construction 1. Foot injury while 1. Use gum boots and hand gloves; Barrication of work area;
work construction work
II b B Authorised manpower only
III c D
2. Injury in hands 2. Injury in hands II b B 2. Use hand gloves at all times III c D
Construct wall, beam & column, Partition of admin office OK
2 Construction Work Routine Daily Area is clear
etc. in respective area Acceptable
3. Dust 3. Dust II b B 3. Wear face mask III c D
RCC Casting of Floor, Foundation RCC Casting of Floor, 2. Use hand gloves aand other proper PPEs; Work OK
3 Casting Work Non Routine 3-4 times a week 2. Injury in hands Area is clear 2. Injury in hands III c D IV d E
etc. Foundation etc. Instructions to be given in daily KYT meeting Acceptable
1.Dust can get into eyes, 1. Barrication of work area; Authorised manpower only;
1. Dust
nose, mouth
II c C Wear face mask and goggles at all times
III d E
2. Cut Injury 2. Cut Injury II c C 2. Provide all proper PPEs (hand gloves etc.) III d E
On site wood work for OK
5 Wood Work Wood work for canteen interior Temporary Daily after work start Area is clear
furniture, interior etc. Acceptable
3. Eye injury 3. Eye injury II c C 3. Use safety goggles III d E
1. Cut injury 1. Cut injury II c C 1. Barrication of work area; Authorised manpoer only III d E
Existing windows, doors
dismantling and new Galss material in area.
Dismantling/ Installation of 2. Wear face mask, hand gloves, safety shoes at all times; OK
7 Glass Work window, doors Temporary Daily after work start 2. Foot/Hand injury Fragile and prone to 2. Foot/Hand injury II c C III d E
windows, doors & partition work Provide all proper PPEs Acceptable
installation, glass breaking
partition work
3. Use Safety Goggles; Work Instructions to be given in daily
3. Eye injury 3. Eye injury II c C KYT meeting
III d E
4. Damage to material/
4. Fall injury
property
II c C 4. Work Instructions to be given in daily KYT meeting III d E
4. MSD (in manual lifting) 4. MSD (in manual lifting) II b B 4. Avoid manual lifting if possible. Use trolley instead III c D