Wasio 3bedroom
Wasio 3bedroom
350
15,900 500
K J I H G F E D C B A 10 9 87 6 5 4 3 2 1 0 drawing available .
5.Foundation depth to be determined on site.
750 2,000 1,200 3,750 2,450 1,200 1,700 1,800 +6181 +6181
200 550 200 200 200 200 200 200 200 300 200
6.All drainage and plumbing works to the MOH standards and satisfaction.
ROOF COVER. 7.No alteration shall be done to the drawing without Architects consent.
1,800 1,350 3,550 3,450 1,500 1,600
Pre-painted ridge cap
200 200 450 350 400 400 600 500 250 pitch 8.All works to be carried out in accordance with Local Authority Regulations.
750 1,800 1,350 3,300 700 950 700 1,000 2,250 9.Permanent vents to be provided to all openings.
ROOF COVER.
Y
+3500 +3500
10.All Reinforced Concrete works to be done to structural engineer's details.
K K Pre - painted gauge 28
900
900
1,500
12.Walls less than 200mm thick to be reinforced with hoop irons at every
1,300
pitch- 300, on
J LAUNDRY J
275
200 200
timber
. rafters/trusses two alternate courses.
1,100
1,100
725
200
500
REAR FINISHES
I PORCH I 200 X25mm hard wood
750 800
fascia board painted to
1,200
1,200
1.600mmx600mmx50mm thick precast concrete slabs laid
2,450
2,400
+0 approval +0
H BEDROOM2 shr/wc
H on and including 50mm sand bed and pointed in c/s paved walkways.
2,700
PANTRY steel burglar proof door
3,300
2.3coats of approved emulsion paint to 13mm thick cement sand and lime
950
950
KITCHEN painted to approval
plastered surfaces of internal/ceiling surface.
G G
200
350 500
DINING 900 1,100 1,200 950 1,250 1,500 900 3,500 700 1,850 750 2,000 1,200 3,750 2,450 1,200 1,700 1,800
3.Fair face finish to machine cut external walls with cement and sand(1:3) mix
2,750
900
1,250
1,250
200
column to structural.r morta pointing.
K J I H G F E D C B A 10 9 87 6 5 4 3 2 1 0
400 600
2,550
200
4.Ceramic tiles floor finsh on 1:3 c/s mix floor screed not less than 20mm level or
RG
250 500 250
walk in
200
specifications
2,000
1,000 1,000
wc
ELEVATION B ELEVATION A to fall as necessary.
1,500
1,500
closset
1,000
PASSAGE
14,050
14,050
800
200
MECHANICAL WORKS
D
B
E E
200
200
200
100:1 Scale 100:1 Scale
400
600 400
shr
900
900
900
FP 1.All sanitary fittings,doors,windows and lifts to schedule.
200
D D 2.All plumbing and dtrainage to comply with the city council's specifications.
A B C D E F G H I J K 0 1 2 3 4 5 6 78 9 10 3.SVP denote Sewer Vent Pipe to be provided at the head of dtraninage.
900
MASTER
BEDROOM1
4,000
+6181 +6181
MH denoted Manhole.
LOUNGE BEDROOM
3,500
3,300
2,900
3,500
4.All service ducts to be accessible from every door.
M.H denotes ManHole
2,400
200
+3500 steel casement +3500
700
700
725
725
B B window to detail CIVIL WORKS
150x70mm precast conc. 1.All soils on cut embarkments to be stabilised.
1,509
1,509
ENTRY
1,850
1,650
1,850
1,550
PORCH window sill painted to 2.All soils under slabs and around external foundations to be treated with
475 475 approval.
3,800 anti-termite chemicals.
A A
316
316
200
200
200mm thick masonry 3.All slabs at ground level to be casted over 1000gauge polythene sheeting
walling
Y
C A
100a C.I inlet pipe
and cleaning access
B
CHAMBER
A INLET cross ventilation A
GRIT
CHAMBER DISTRIBUTION
baffles CHAMBER
10 9 8 7 6 5 4 3 2 1 0 CEILING DETAILS.
100x50mm timber struts
12mm water proof
cement rendered
to smooth finish
celotex ceiling board fixed
B
at 1200mm centre on 50x50mm brandering at CLIENT DETAILS
17,000 100/150 dia. soil pipe laid to fall 100x50mm wall plate 600mm c/c
750 2,000 1,550 3,750 2,450 1,200 1,700 1,800
500 125mm r.c sla 1:2:4 mix NAME:BENEDETA KALILA
500 250 500
2,300
500 250 500
3,250
500
3,950
500
1,200
500
1,300
500 500 INLET
CHAMBER
100mm
opening for
DISTRIBUTION
CHAMBER K J I H G F E D C B A
100a C.I inlet pipe
and cleaning cross signature
access ventilation effluent to
radial arms +6181
Y
500
500
K K DRAWING TITLE
pipe laid to fall agricultural drains
400 200
1,000
lintel
900
900
500 200
75 thick r.c
baffles F1
100 500
F2
J J
buffer wall
500 500
150mm thick
WORKING DRAWINGS[FLOOR
concrete slab
1,100
1,100
I I +3500 PLAN,ELEVATIONS,SECTIONS&ROOF
1,200
1,200
H H
SECTION A-A
PLAN DETAILS]
3,800
950
D
1,250
1,250
F F water level
150mm thick
DESIGNED BY K.L.B
500
masonry wall
1,500
1,500
1,800
750
CHECKED BY T.O
15,150
15,150
500
+0
1,100
1,200
D
B
900
MARCH,2024
450
cement rendered to
smooth finish.
where specified .
DATE
D D SECTION C-C
150mm thick base slab.
SECTION B-B
SCALE 1:100,1:75
900 1,100 1,200 950 1,250 1,500 900 3,500 700 1,850
4,700
C
3,500
3,800
3,500
K J I H G F E D C B A CONSULTANTS
C C 50mm thick floor finish on 150mm conc
600x200mm foundation concrete slab with A142 BRC mesh on 1000 gauge
footing, depth to be determined clear polythene DPM on 50mm thick
700
700
500 350
500 350
200
200
NOTES.
1,850
of 1500x3000x2400 deep.
1,300
1,300
12mm diameter ms
SECTION Y-Y
bars at 150mm 2. Radial arms-3N0 radial arms of 150
C/C both ways . C
a pvc pipes encased in hardcore and
500
Y
Scale 1:100
LITRES PERSONS INTERVAL
500 250 500 500 500 500 500 50 500 500 500 100 500 (YEARS) A B C D E F1 F2
2,300 5,150 1,301 2,300 01 3,000 10 2 800 1,000 1,000 3,000 800 1,200 1,400
500 02 6,000 20 2 800 1,400 1,200 3,600 1,400 1,500 1,400
03 9,000 30 2 800 1,400 1,200 3,600 1,800 1,500 1,400
750 2,000 1,550 3,750 2,450 1,200 1,700 1,800 04 12,000 40 2 800 1,600 1,400 4,000 2,000 1,500 1,300
17,000
05 15,000 50 2 800 1,600 1,400 4,000 2,400 1,500 1,200
06 22,500 100 1.5 800 3,600 1,800 5,600 3,000 1,850 1,500
07 45,000 200 1.5 800 5,600 2,800 8,600 5,600 2,040 1,500
08 67,500 300 1.5 800 7,600 3,800 11,600 3,600 2,260 1,500
09 90,000 400 1.5 800 8,800 4,400 13,400 2,300 2,380 1,500
10 9 8 7 6 5 4 3 2 1 0
SEPTIC TANK DETAILS
Scale 1:100
A
ROOF PLAN
GSPublisherEngine 0.20.100.100
100:1 Scale
GSPublisherVersion 0.0.100.100