Solar Plant Maintenance Check Sheet

The document is a maintenance check sheet detailing the maintenance status of various transformers and associated equipment, including inverter and power transformers. It includes information on maintenance dates, tasks completed, and remarks for each unit, indicating whether the maintenance is completed or scheduled for the next fiscal year. Overall, it serves as a record for tracking maintenance activities and planning future maintenance tasks.

Uploaded by

ankitsvora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

Solar Plant Maintenance Check Sheet

The document is a maintenance check sheet detailing the maintenance status of various transformers and associated equipment, including inverter and power transformers. It includes information on maintenance dates, tasks completed, and remarks for each unit, indicating whether the maintenance is completed or scheduled for the next fiscal year. Overall, it serves as a record for tracking maintenance activities and planning future maintenance tasks.

Uploaded by

ankitsvora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Maintenance check sheet

Inverter Transformer Power transformer AC side maintenance Switchyard


Installe
Sr. No. SPV d Oil filtration / Date of Relay Remarks Planning
MWp Overhauling Date of Date of Maintenan
overhauling / Maintenanc calibrati Date of Maintenance
done? overhauling Maintenance ce done?
testing done? e on done?
Filteratiion-
1 Solitaire 15.00 Done 11/02/2019 to 09/02/2019 Filteration
26/06/2019
Done 12/16/2018 Done 5/24/2019 Completed

Filteratiion-
2 Precious 15.00 Done 23/01/2019 to 11/03/2019 Filteration
25/06/2019
Done 12/15/2018 Done 5/22/2019 Completed

Power Transformer:
03-12-2018 and 07-
3 Kindle 50.10 Done 2/11/2019 to 18/02/2019 Not Done N/A Done
12-2018
Done 18-05-2019 to 20-05-2019 PO issued for Power Trasformer Post monsoon (winter
season)
Oil
18/06/2019 to 16-12-2018 & 18-
4 Sandland 25.00 Done 19/01/2019 to 10/02/2019filtration,overhauling
26/06/2019
Done
12-2018
Done 5/29/2019 Completed
and testing done
5 Chattel 25.00 Done Mar-19 Not Done N/A Done 05.12.2018 Done 05.12.2018 Next FY
6 Responsive 25.00 Done 29.04.2019 Not Done N/A Done 28.10.2018 Done 28.10.2018 Next FY
7 Ujjwala 23.06 Done 05.10.2018 Not Done N/A Done 28.10.2018 Done 28.10.2018 Next FY
Power Transformer:
For AC Side Maintenance: In CR
Filtration only, Inverter
11 kV panels VCB maintenance
Transformer : Radiator
8 Ganges Green25.00 Not Done N/A Not Done N/A Yes 1/25/2019 Done by Juwi 03-06-2019 to 08-06-2019 & 11 kV Panels Relay
replacement
calibration done (work done by
Post monsoon (winter
Akron Energy)
season)
For Inverter Trafo: WCC & MOM
has been signed with pending
LT1/TR1: 28/02/2019
point details sent on mail by
LT1/TR2: 01/03/2019
Ashish dated 21.06.2019 (work Power Transformer:
LT2/TR3: 08/02/2019
done by K K Electricals) Filtration, testing
9 CBC 10.00 Done LT2/TR4: 07/02/2019 Not Done N/A Done 1/29/2019 Done by Juwi 6/11/2019
For AC Side Maintenance: In CR Post monsoon (winter
Aux. Trafo:
11 kV panels VCB maintenance season)
01/03/2019
& 11 kV Panels Relay
calibration done (work done by
Akron Energy)
LT1/TR1: 11/02/2019
LT1/TR2: 10/02/2019
10 Ganeshwani 5.00 Done Aux. Trafo: Not Done N/A Done 1/29/2019 Done by Juwi 6/10/2019 do Next FY
13/02/2019
For Inverter Trafo: WCC & MOM
LT1/TR1: 18/02/2019 has been signed with pending
LT2/TR2: 19/02/2019 point details sent on mail by
LT3/TR3: 13/03/2019 Jimmi & Pritesh dated
Power Transformer:
LT4/TR4: 20/02/2019 16/03/2019 & 28/05/2019 &
Done (Punch point Filtration, testing
11 Porbandar 15.00 pending)
LT5/TR5: 22/02/2019 Not Done N/A Done 1/17/2019 Done by Juwi 5/9/2019 work done by Akron Energy
Post monsoon (winter
LT6/TR6: 23/02/2019 For AC Side Maintenance: In CR
season)
LT7/TR7: 12/03/2019 11 kV panels VCB maintenance
LT9/TR9: 24/02/2019 & 11 kV Panels Relay
calibration done & work done
by Akron Energy Power Transformer:
For AC Side Maintenance: In CR
Filtration only, Inverter
11 kV panels VCB maintenance
Transformer : Radiator
12 Hiraco 20.00 Not Done N/A Not Done N/A Yes 1/10/2019 Done by Juwi 5/9/2019 & 11 kV Panels Relay
replacement
calibration done & work done
Post monsoon (winter
by Akron Energy
season)
Testing 10.06.2019 to
13 Deligentia 24.50 Done 31.01.2019 to 12.02.2019 NA NA
done 20.06.2019
Done 15-06-2019 to 18-06-2019 Completed
Relay testing and switchyard
14 BIDL 15.75 Not Done N/A Not Done N/A Done 20-2-2019 To 21-2-2019 Done 2/22/2019 maintenance done by K.K Post Monsoon
engineering
Relay testing and switchyard
15 BIPL 15.75 Not Done N/A Not Done N/A Done 20-2-2019 To 21-2-2019 Done 23-02-2019 maintenance done by K.K Post Monsoon
engineering
Relay testing and switchyard
16 Magnet-1 26.25 Not Done N/A Not Done N/A Done 26-2-2019 To 27-2-2019 DONE 03-03-2019 maintenance done by K.K Post Monsoon
engineering
Relay Testing and Switchyard
17 Magnet-2 26.25 Not Done N/A Not Done N/A Done 1.03.2019 Done 28.02.2019 to 03.03.2019 Maintenance done by K.K Post Monsoon
Engineering
18 Amun 18.00 Done 13.05.2019 TO 24.05.2019 N/A NA 18.07.2018 02.06.2019 Done 24.05.2019 Next FY
19 Avighna 18.00 Not Done N/A Not Done N/A Done 7/10/2018 Done 5/21/2019 Next FY
NA NA
20 SIIPL-TN 5.00 ( Dry type ( Dry type Done 6/7/2019 No 9/20/2018 Done 6/7/2019 Completed
transformer) transformer)
21 Aftaab-OD 5.50 Done 4/13/2019 NA NA No 25 to 28-05-2019 Done 5/28/2019 During premonsoon all are reche Completed
Transformer OH quotation sent
21.05.2019 to
22 SEL-WB 5.45 Not Done Not Done NA NA Not Done
24.05.2019
Done 06.06.2019 to 10.06.2019 to H.O in Feb'19. Relay testing Next FY, if required
pending since 6 years.