Maintenance check sheet
Inverter Transformer Power transformer AC side maintenance Switchyard
Installe
Sr. No. SPV d Oil filtration / Date of Relay Remarks Planning
MWp Overhauling Date of Date of Maintenan
overhauling / Maintenanc calibrati Date of Maintenance
done? overhauling Maintenance ce done?
testing done? e on done?
Filteratiion-
1 Solitaire 15.00 Done 11/02/2019 to 09/02/2019 Filteration
26/06/2019
Done 12/16/2018 Done 5/24/2019 Completed
Filteratiion-
2 Precious 15.00 Done 23/01/2019 to 11/03/2019 Filteration
25/06/2019
Done 12/15/2018 Done 5/22/2019 Completed
Power Transformer:
03-12-2018 and 07-
3 Kindle 50.10 Done 2/11/2019 to 18/02/2019 Not Done N/A Done
12-2018
Done 18-05-2019 to 20-05-2019 PO issued for Power Trasformer Post monsoon (winter
season)
Oil
18/06/2019 to 16-12-2018 & 18-
4 Sandland 25.00 Done 19/01/2019 to 10/02/2019filtration,overhauling
26/06/2019
Done
12-2018
Done 5/29/2019 Completed
and testing done
5 Chattel 25.00 Done Mar-19 Not Done N/A Done 05.12.2018 Done 05.12.2018 Next FY
6 Responsive 25.00 Done 29.04.2019 Not Done N/A Done 28.10.2018 Done 28.10.2018 Next FY
7 Ujjwala 23.06 Done 05.10.2018 Not Done N/A Done 28.10.2018 Done 28.10.2018 Next FY
Power Transformer:
For AC Side Maintenance: In CR
Filtration only, Inverter
11 kV panels VCB maintenance
Transformer : Radiator
8 Ganges Green25.00 Not Done N/A Not Done N/A Yes 1/25/2019 Done by Juwi 03-06-2019 to 08-06-2019 & 11 kV Panels Relay
replacement
calibration done (work done by
Post monsoon (winter
Akron Energy)
season)
For Inverter Trafo: WCC & MOM
has been signed with pending
LT1/TR1: 28/02/2019
point details sent on mail by
LT1/TR2: 01/03/2019
Ashish dated 21.06.2019 (work Power Transformer:
LT2/TR3: 08/02/2019
done by K K Electricals) Filtration, testing
9 CBC 10.00 Done LT2/TR4: 07/02/2019 Not Done N/A Done 1/29/2019 Done by Juwi 6/11/2019
For AC Side Maintenance: In CR Post monsoon (winter
Aux. Trafo:
11 kV panels VCB maintenance season)
01/03/2019
& 11 kV Panels Relay
calibration done (work done by
Akron Energy)
LT1/TR1: 11/02/2019
LT1/TR2: 10/02/2019
10 Ganeshwani 5.00 Done Aux. Trafo: Not Done N/A Done 1/29/2019 Done by Juwi 6/10/2019 do Next FY
13/02/2019
For Inverter Trafo: WCC & MOM
LT1/TR1: 18/02/2019 has been signed with pending
LT2/TR2: 19/02/2019 point details sent on mail by
LT3/TR3: 13/03/2019 Jimmi & Pritesh dated
Power Transformer:
LT4/TR4: 20/02/2019 16/03/2019 & 28/05/2019 &
Done (Punch point Filtration, testing
11 Porbandar 15.00 pending)
LT5/TR5: 22/02/2019 Not Done N/A Done 1/17/2019 Done by Juwi 5/9/2019 work done by Akron Energy
Post monsoon (winter
LT6/TR6: 23/02/2019 For AC Side Maintenance: In CR
season)
LT7/TR7: 12/03/2019 11 kV panels VCB maintenance
LT9/TR9: 24/02/2019 & 11 kV Panels Relay
calibration done & work done
by Akron Energy Power Transformer:
For AC Side Maintenance: In CR
Filtration only, Inverter
11 kV panels VCB maintenance
Transformer : Radiator
12 Hiraco 20.00 Not Done N/A Not Done N/A Yes 1/10/2019 Done by Juwi 5/9/2019 & 11 kV Panels Relay
replacement
calibration done & work done
Post monsoon (winter
by Akron Energy
season)
Testing 10.06.2019 to
13 Deligentia 24.50 Done 31.01.2019 to 12.02.2019 NA NA
done 20.06.2019
Done 15-06-2019 to 18-06-2019 Completed
Relay testing and switchyard
14 BIDL 15.75 Not Done N/A Not Done N/A Done 20-2-2019 To 21-2-2019 Done 2/22/2019 maintenance done by K.K Post Monsoon
engineering
Relay testing and switchyard
15 BIPL 15.75 Not Done N/A Not Done N/A Done 20-2-2019 To 21-2-2019 Done 23-02-2019 maintenance done by K.K Post Monsoon
engineering
Relay testing and switchyard
16 Magnet-1 26.25 Not Done N/A Not Done N/A Done 26-2-2019 To 27-2-2019 DONE 03-03-2019 maintenance done by K.K Post Monsoon
engineering
Relay Testing and Switchyard
17 Magnet-2 26.25 Not Done N/A Not Done N/A Done 1.03.2019 Done 28.02.2019 to 03.03.2019 Maintenance done by K.K Post Monsoon
Engineering
18 Amun 18.00 Done 13.05.2019 TO 24.05.2019 N/A NA 18.07.2018 02.06.2019 Done 24.05.2019 Next FY
19 Avighna 18.00 Not Done N/A Not Done N/A Done 7/10/2018 Done 5/21/2019 Next FY
NA NA
20 SIIPL-TN 5.00 ( Dry type ( Dry type Done 6/7/2019 No 9/20/2018 Done 6/7/2019 Completed
transformer) transformer)
21 Aftaab-OD 5.50 Done 4/13/2019 NA NA No 25 to 28-05-2019 Done 5/28/2019 During premonsoon all are reche Completed
Transformer OH quotation sent
21.05.2019 to
22 SEL-WB 5.45 Not Done Not Done NA NA Not Done
24.05.2019
Done 06.06.2019 to 10.06.2019 to H.O in Feb'19. Relay testing Next FY, if required
pending since 6 years.