0% found this document useful (0 votes)
7 views7 pages

B14. Pelaksanaan Kegiatan Pengawasan Dan Evaluasi Pekerjaan Konstruksi Proyek W5 Maret - Area-Unit (HMU U-068) - Agusyuwono

The document is a report on the supervision and evaluation of construction activities for the Hydrogen manufacturing unit U-321 at PT. Kilang Pertamina Balikpapan, detailing monitoring activities, construction constraints, and progress mapping. It includes sections on interconnecting piperack work, manpower issues, and project monitoring actions. Documentation and construction progress mapping are provided in appendices.

Uploaded by

yagus7697
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views7 pages

B14. Pelaksanaan Kegiatan Pengawasan Dan Evaluasi Pekerjaan Konstruksi Proyek W5 Maret - Area-Unit (HMU U-068) - Agusyuwono

The document is a report on the supervision and evaluation of construction activities for the Hydrogen manufacturing unit U-321 at PT. Kilang Pertamina Balikpapan, detailing monitoring activities, construction constraints, and progress mapping. It includes sections on interconnecting piperack work, manpower issues, and project monitoring actions. Documentation and construction progress mapping are provided in appendices.

Uploaded by

yagus7697
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

JASA PENGAWASAN DAN EVALUASI PEKERJAAN

KONSTRUKSI EPC ISBL OSBL RDMP RU V


BALIKPAPAN

LAPORAN PELAKSANAAN KEGIATAN


Evaluasi Pekerjaan Konstruksi Proyek W1
Maret - Area-Unit (Piperack U-321
R10,R11).pptx W5 April (Tgl 26 April – 30 April ) 2025

FUNGSI CONSTRUCTION BALIKPAPAN


PT. KILANG PERTAMINA BALIKPAPAN
TAHUN 2025
FUNGSI CONSTRUCTION BALIKPAPAN
PT. KILANG PERTAMINA BALIKPAPAN

LAPORAN PELAKSANAAN KEGIATAN PENGAWASAN DAN EVALUASI Sheet 2 of 7


PEKERJAAN KONSTRUKSI PROYEK

TABLE OF CONTENT

I. MONITORING ACTIVITY .................................................................. 3


1. INTERCONNECTING PIPERACK – U321 – R11 .............................................................. 3

II. CONSTRAINT AND EVALUATION OF CONSTRUCTION WORK ... 4


2. Hydrogen manufacturing unit U-321 .......................................................................... 4

III. OTHERS ........................................................................................... 5


IV. CONSTRUCTION PROGRESS MAPPING ....................................... 6
V. DOCUMENTATION........................................................................... 7

This document is the property of PT. Kilang Pertamina Balikpapan who will safeguard its rights according to the civil and penal provisions of the Law.
FUNGSI CONSTRUCTION BALIKPAPAN
PT. KILANG PERTAMINA BALIKPAPAN

LAPORAN PELAKSANAAN KEGIATAN PENGAWASAN DAN EVALUASI Sheet 3 of 7


PEKERJAAN KONSTRUKSI PROYEK

I. MONITORING ACTIVITY
1. INTERCONNECTING PIPERACK – U321 – R11

Following are weekly construction activities in Area/Unit Hydrogen manufacturing unit U-321 :
- Piping Work INTERCONNECTING PIPERACK – U321 – R11
• Closing punchlist
• Pipe support installation

This document is the property of PT. Kilang Pertamina Balikpapan who will safeguard its rights according to the civil and penal provisions of the Law.
FUNGSI CONSTRUCTION BALIKPAPAN
PT. KILANG PERTAMINA BALIKPAPAN

LAPORAN PELAKSANAAN KEGIATAN PENGAWASAN DAN EVALUASI Sheet 4 of 7


PEKERJAAN KONSTRUKSI PROYEK

II. CONSTRAINT AND EVALUATION OF CONSTRUCTION WORK


2. Hydrogen manufacturing unit U-321

Following are weekly construction constraints and evaluation in Area/Unit Hydrogen


manufacturing unit U-321:
- Leak of manpower

This document is the property of PT. Kilang Pertamina Balikpapan who will safeguard its rights according to the civil and penal provisions of the Law.
FUNGSI CONSTRUCTION BALIKPAPAN
PT. KILANG PERTAMINA BALIKPAPAN

LAPORAN PELAKSANAAN KEGIATAN PENGAWASAN DAN EVALUASI Sheet 5 of 7


PEKERJAAN KONSTRUKSI PROYEK

III. OTHERS
1. Deliver Project Monitoring Action Report (PMAR) as follow:
- PMAR No XXXX:
2. Deliver Pengamatan Keselamatan Kerja (PEKA) as follow:
- PEKA:

This document is the property of PT. Kilang Pertamina Balikpapan who will safeguard its rights according to the civil and penal provisions of the Law.
FUNGSI CONSTRUCTION BALIKPAPAN
PT. KILANG PERTAMINA BALIKPAPAN

LAPORAN PELAKSANAAN KEGIATAN PENGAWASAN DAN EVALUASI Sheet 6 of 7


PEKERJAAN KONSTRUKSI PROYEK

IV. CONSTRUCTION PROGRESS MAPPING

Construction Progress Mapping can be found in Appendix A

This document is the property of PT. Kilang Pertamina Balikpapan who will safeguard its rights according to the civil and penal provisions of the Law.
FUNGSI CONSTRUCTION BALIKPAPAN
PT. KILANG PERTAMINA BALIKPAPAN

LAPORAN PELAKSANAAN KEGIATAN PENGAWASAN DAN EVALUASI Sheet 7 of 7


PEKERJAAN KONSTRUKSI PROYEK

V. DOCUMENTATION

Documentation can be found in Appendix B

This document is the property of PT. Kilang Pertamina Balikpapan who will safeguard its rights according to the civil and penal provisions of the Law.