0% found this document useful (0 votes)
129 views5 pages

PLC Practical Assessment Checklist

This document outlines the practical assessment checklist for operating Programmable Logic Control (PLC) systems as part of the Mechatronics Technology Level 5 curriculum. It includes evaluation criteria for safety gear, electrical safety, tool usage, correct connections, programming, and operation of the PLC system, with a total score of 62 out of 100. The assessment determines whether the candidate is competent based on achieving at least 50% of the total marks.

Uploaded by

Isaac Kimaru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views5 pages

PLC Practical Assessment Checklist

This document outlines the practical assessment checklist for operating Programmable Logic Control (PLC) systems as part of the Mechatronics Technology Level 5 curriculum. It includes evaluation criteria for safety gear, electrical safety, tool usage, correct connections, programming, and operation of the PLC system, with a total score of 62 out of 100. The assessment determines whether the candidate is competent based on achieving at least 50% of the total marks.

Uploaded by

Isaac Kimaru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

©2024 TVET CDACC

071605T4MCT
MECHATRONICS TECHNOLOGY LEVEL 5
ENG/OS/MC/CR/06/5/A
Operate Programmable Logic Control (PLC) Systems
Nov/Dec 2024

TVET CURRICULUM DEVELOPMENT, ASSESSMENT AND CERTIFICATION


COUNCIL (TVET CDACC)

PRACTICAL ASSESSMENT

OBSERVATION CHECKLIST

Candidate’s name & Registration No.


Assessor’s name & Reg. Code
Venue of Assessment
Date of assessment
Items to be Evaluated: Please award marks as Marks Marks Comments
appropriate. Give a brief comment on your available obtained
observation.

1. Wore personal safety gear


• Overall/dust coat
• Safety boots
Award 1 mark for each PPE worn correctly 2
and
0 if any is not worn
Sub-Total 2

Page 1 of 5
©2024 TVET CDACC
2. Observed electrical safety rules.
• Disconnected from the main before
2
doing any wiring.
Award 2 marks for the above safety rule
and 0 if failed to observe

3. Used correct tools for correct operations.


• star and flat drivers on the right
screws
3
• side cutter
• stripping knife
Award 1 mark for each correct use

4. Connected power to the PLC correctly


• Live
• Neutral
• Earth 3
Award 1 mark for each correctly connected
line
5. Connected the peripheral devices to the
PLC correctly.
• Start button
• Stop button
• Capacitive sensor 7
• Inductive sensor
• Red LED
• Yellow LED
• Green LED
Award 1 mark for each correctly connected
component
6. Connected power correctly to the PLC
input and output interfaces.
2
Award 1 mark for each correct connection

7. Powered the PLC ON. 1


Award 1 mark for correct powering

Page 2 of 5
©2024 TVET CDACC
Sub-Total 18

[Link] the ladder logic program code correctly


• Wrote the code/ list of operands
• Correct ladder logic diagram for the 2
program was produced (Award 5 or 0)
• Correctly identified the inputs (Award 1 3
mark each, maximum 3)
• Correctly identified the outputs (Award 1 3
mark each, maximum 2)
2
Sub-Total 12

9. Opened the correct programming software


and set the parameters
3
Award 1 mark for correct software used,1
mark for correct plc series and 1 mark for
correct programming language selection

10. Wrote the correct ladder diagram for the 8


tasks
Award 8 marks for correct ladder program
11. Simulated the program/ run the program in
monitor mode if the software lacks
simulation
Award 2 marks for simulation
12. Set the PLC to programming mode before
downloading the program.
3
Award 3 mark or zero
13. Downloaded the program to the PLC
Award 2 marks or zero
2

Page 3 of 5
©2024 TVET CDACC
14. Set the PLC to running mode. 2
Award 2 marks or zero
Sub-Total 20

TASK 3: OPERATED

15. Operated the PLC system as per the


requirements
• Green light is ON when start button
is pressed

• yellow light goes ON when 8


capacitive sensor counts to 6
• Green light goes ON when
inductive sensor counts to 3
• Stop button powers off the whole
system
Award 2 marks for each correct operation
16. Powered of the system and disassembled 2
the set up

Sub-Total 10

GRAND TOTAL 62

( 𝟏𝟎𝟎%
SCORE x

)
62

ASSESSMENT OUTCOME

The candidate was found to be:

Competent Not yet competent


(Please tick as appropriate)
(The candidate is competent if the candidate obtains at least 50% of the total marks allocated.

Page 4 of 5
©2024 TVET CDACC
Feedback from candidate:

Feedback to candidate:

Candidate’s Signature Date

---------------------------------- -------------------------------------

Assessor’s Signature Date

---------------------------------- -------------------------------------

Page 5 of 5

You might also like