0% found this document useful (0 votes)
190 views1 page

Distribution Board Inspection Checklist

Uploaded by

amad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
190 views1 page

Distribution Board Inspection Checklist

Uploaded by

amad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

DISTRIBUTION BOARDS AND ELCB INSPECTION CHECK LIST

Name Of Contractor: Name of Inspector: Date Of Inspection: Site Name:

Sr. #. Check Points YES NO Remarks

Are distribution boards numbered?


1

2 Has earth leakage circuit breaker been installed?

3 Is the earth leakage operational when tested?

4 Is the main circuit breaker readily identifiable and accessible at all times?

5 Are all openings covered to ensure that there are no bare conductors exposed?

6 Are the symbolic signs clearly displayed and understandable?

7 Are all the distribution boards face plates securely fastened and in place?

8 Are all switches clearly labeled?

9 Are Canopy or weather protection (Rain, moisture) in place

Breaker Physical Condition


Breaker Capacity ELCB / RCCB Breaker Status Operational Protective Cover Cable Insulation Inspected by (Name,
Date Time Location of Breaker Identification (Burn/Arcing/ Remarks
Amp Sencitivity mA (ON/OFF/TRIP) Check (Trip Test) Status Condition Designation,Signature)
Number Melting/ Flashover)

Note:
1. This check list must be filled and signed by Site Competent electrical person only
2. Copy of the inspection report shall be submitted to Siemens EHS representative once the inspection is completed.