RESUME
SANJAY KUMAR SINGH
Permanent Address:
VILL : BAMOURA
P.O : VIDYAPATINAGAR
DIST : SAMASTIPUR, BIHAR-848503
Contact
E-mail: singhsanjay506@[Link]
Mob. No- +91 7250947490, +91 8271133320
Career Objective:
To Work in a healthy environment and try to sustain in the Industry making the best use of
my potential. To work at a place which focuses on customers, believes and values its
employees by providing them a working environment where they can contribute to their
maximum in achieving the long term goals of the organization.
Work Experience:
Current Employer
Employer: AFCONS INFRASTRUCTURE LIMITED
Period: December 2015 to Till date
Previous Employer
Employer : BSC-C&C JV
Name of work : DFCCIL (Dedicated Freight Corridor Corporation of India Limited
Project : New Karwandiya(Bihar)to New Ganjkhawaja (Mughalsarai) From Chainage from
KM.14+00 to117+00
Client : DFCCIL (Dedicated Freight Corridor Corporation of India Limited
Consultant : Smec-Rodic JV
Project Cost : 780.60 Crores
Position Held : Sr. Foreman (Electrical)
Period : Sep 2009 to August’2015
Employer : Hindustan Construction Co. Ltd.
Name of work : Chamera Hydro Electrical Project Stage III, Himachal Pradesh
Project : Hydro Project
Client : NHPC
Position Held : Foreman (Electrical)
Period : Aug 2007 to June 2009
Employer : Hindustan Construction Co. Ltd.
Name of work : Construction of Allahabad by pass project (Rigid pavement ) from Km. 158 to 198 (Except
Ganga Bridge), Uttar Pradesh
Project : Allahabad by pass project-II
Client : National Highway Authority of India
Consultant : BCEOM-LASA (JV)
Project Cost : 450 Crores
Position Held : Foreman (Electrical)
Period : July 2004 to April 2007
Employer : Hindustan Construction Co. Ltd.
Name of work : Construction of Cable Stayed Bridge across River Yamuna at Allahabad
/Naini (U.P.)
Client : National Highway Authority of India
Consultant : COWI-SPAN (JV)
Project Cost : 220 Crores
Position Held : Jr. Foreman (Electrical)
Period : Oct 2000 to June 2004
Employer : Hindustan Construction Co. Ltd.
Name of work : Hathni Kund Barrage, HARYANA
Client : Irrigation Department of Haryana Government
Project Cost : 150 Crores
Position Held : Sr. Electrician
Period : Mar 1997 to May 2000
Employer : NJJV
Name of work : Nathwa Jakhri Hydro Power Project, Himachal Pradesh
Project : Hydro Project
Client : NJPC
Position Held : Electrician
Period : June 1993 to Feb.1997
Employer : Hindustan Construction Co. Ltd.
Name of work : Chamera Hydro Electrical Project Stage I, Himachal Pradesh
Project : Hydro Project
Client : NHPC
Position Held : Wire Man
Period : Aug 1987 to June 1993
Work profile
Erection, Testing and commissioning of 750 KVA x 4 generators, breakers,
Transformers.
Erection of Auto Synchronized auto loads sharing panel and power and control cable
connection.
Erection testing and commissioning of 750KVA x4 and 320KVA generator, breakers
and Auto Synchronized auto loads sharing panel and power and control cable
connection.
Maintenance and operation of electrical equipments like welding machines, mig
machine, frequency convertor, Breakers, power tools, power winch, Power pack,
Motor, pumps etc.
Cable diversion, Building Electrification, Lying & Termination of power cables as per
drawing.
Maintain of electrical safety document on monthly basis.
Erection of Auto Synchronized auto loads sharing panel and power and control cable
connection
Maintenance and operation of electrical equipments like welding machines, mig
machine, frequency convertor, Breakers, power tools, power winch, Power
pack ,Motor, pumps etc.
Testing & commissioning of panels & transformer, Fixing and testing of distribution
boards.
Electrical system maintenance (PCC/MCC) Panel, instrumentation- temp., pressure
level etc. Installation/ commissioning, working troubleshooting of plants-
(a) Hot Mix Plant (Linehoff, Porker), Concrete Batch Plant (Schewing Stetter,
Macons, Bhai) (b) WMM Plant (Apollo Equipments, Max Mech.)
(c) Crushing Plant (Sandvik, Metso)
Erection of high mast, Erection of earth pits. Etc
Conducting. Wiring, cabling for light points & power points.
Install & testing of various light fixtures, cabling, testing & commissioning of L.T.
Panels.
Providing supply from D.G. set to panels in case of power breakdown.
Represent for electrical training at site.
Technical & Educational Qualification
Completed Diploma in Electrical & Electronic Engineering in the Year 2013.
Completed Wiremen License Course (No.1273) in the year 1990.
Completed Intermediate in Science from Bihar Secondary education Board Patna in the year
1995.
Declaration: I consider myself familiar with mentioned aspects. I am also confident of my
ability to work in a team. I hereby declare that the information furnished above is true to the
best of my knowledge.
Personal Profile
Father’s Name : Sh. Aprendra Kumar Singh
Date of Birth : 19th October 1968
Marital Status : Married
Passport No. : H3070914 Validity upto 02/02/2019
Date : 20.07.2017
Place : Darbhanga (Sanjay Kumar Singh)