This document summarizes Mohd Norhafiz Bin Othman's internship project involving Petronas' Risk-Based Inspection (P-RBI) methodology. The project focused on applying P-RBI to storage tank T-1201 located at a Petronas facility. Key activities included collecting equipment data, performing a criticality analysis to identify failure modes and their consequences, developing an inspection plan with recommended tasks and locations, and conducting inspections to evaluate the tank's integrity. The internship helped Mohd develop skills like applying P-RBI methodology in a professional setting under supervision.

Uploaded by

Romeo Boii
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
377 views32 pages

P RBI Presentation Slide

This document summarizes Mohd Norhafiz Bin Othman's internship project involving Petronas' Risk-Based Inspection (P-RBI) methodology. The project focused on applying P-RBI to storage tank T-1201 located at a Petronas facility. Key activities included collecting equipment data, performing a criticality analysis to identify failure modes and their consequences, developing an inspection plan with recommended tasks and locations, and conducting inspections to evaluate the tank's integrity. The internship helped Mohd develop skills like applying P-RBI methodology in a professional setting under supervision.

Uploaded by

Romeo Boii
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd

MOHD NORHAFIZ BIN OTHMAN

MECHANICAL ENGINEERING
M9348
UTP Supervisor

: Dr Redzuan

Host Company Supervisors: Mr Eric Ang


Mr Quek Meng Kau

Content

Training Objective
Project & Activities
Project Involvement
Conclusion & Acknowledgement
Q & A Session

Training Objective

Integrate theories with practical


Work side by side with industrial
practitioners
Introduction to work cultures and
industrial practices.
Expose student to potential
employees
Develop skills in communication,
work ethics, management, etc.

Project & Activities

Project Involvement

PMO
PMO

SBO
SBO
LCOT

SKO
SKO

LCOT Layout

T-1201 Layout

P-RBI

Petronas-Risk Based
Inspection (P-RBI)

A method that have been approved to


meet the requirements of API 580 and
being used by PETRONAS

Objectives
To focus inspection resources on critical

equipment which will prevent failures.

P-RBI Benefits

Reduce costs
Provide well defined steps to improve plant
performance
Optimize inspection ,test and maintenance work.
Reduce and ultimately eliminate unplanned
equipment failures.

P-RBI Reduces RiskHow??


Finding and fixing problem before lead to leaks.
An item will be removed from its service if it risk

reach unacceptable level.

P-RBI Implementation Steps


Identify Equipment
Equipment
Identify

Criticality Analysis
Analysis
Criticality
Inspection Planning
Planning
Inspection
Inspection Activities
Activities
Inspection
Evaluate Results
Results
Evaluate
Update Criticality
Criticality
Update
Report Results
Results
Report
Update Inspection
Inspection Plans
Plans
Update

Non-conformance

P-RBI On Storage Tank T-1201

Identifying Equipment

Tank details:
Tank Number: T-1201
Tank Type: Upright Cylindrical fixed

Storage Tank
Reference Height: 13100
Tank Diameter: 11300
Max Liquid Level: 12000
Design Temp: 65C
Design Press: 56 / -6 mbar

Data Example

P-RBI On Storage Tank T-1201

P-RBI On Storage Tank T-1201

Data Collection

We get data for the equipment from:


General Arrangement (GA)
Ultrasound Thickness Test (UT)
PFD and P&ID
Manufacturer Equipment Data Sheet (U-1 Report)

Data Collection Pitfalls


Incomplete data collection
Inappropriate source
Cut and paste errors
Incorrect units of measure

P-RBI On Storage Tank T-1201

Equipment History & Visual Inspection = Inspection


History
Probability of leak is based on how well we
know the true condition of the item
Help to establish the level of deterioration
Rate of deterioration
Confidence Level

P-RBI On Storage Tank T-1201

Corrosion Study

Corrosion study help to understand how the


equipment will fail
Its also used to establish appropriate Inspection
Plans

P-RBI On Storage Tank T-1201

P-RBI On Storage Tank T-1201

Criticality Analysis

RISK
Probability
Probability

Internal
corrosion
External
corrosion
Cracking
Other damage
mechanism

Consequences
Consequences

Cost
Environmental
Toxic

Shell

Bottom

P-RBI On Storage Tank T-1201

P-RBI On Storage Tank T-1201

Criticality

P-RBI On Storage Tank T-1201

Internal Corrosion

P-RBI On Storage Tank T-1201

External Corrosion

P-RBI On Storage Tank T-1201

Enviromental

P-RBI On Storage Tank T-1201

Consequences

P-RBI On Storage Tank T-1201

Production

P-RBI On Storage Tank T-1201

Inspection Planning

Recommended Tasks

Recommended Locations

Define Task & Locations

P-RBI On Storage Tank T-1201

Inspection Management

Type of Inspections

Visual Inspection
Ultrasonic Thickness Testing
Radiography
Penetrant Testing

P-RBI On Storage Tank T-1201

Non-Conformance

Conditions found during inspection


that do not meet acceptance
criteria
Non-conformance report (NCR) can
be generated and tracked in P-RBI

Report & Queries

P-RBI On Storage Tank T-1201

Conclusion

Skill enhanced
Built more confidence
Gained professional experience
Knowledge application

Acknowledgment

Mr Eric Ang
Mr Quek Meng Kau
Engineers & Technicians
Dr Ridzual

Q & A session