SNCR
(Vendor Non-Conformance Report )
Part Name WINDOW DISPLAY QIR No:-SNCR SIP/NC/APR/001
Part Number DB64-02585A Quality-Incoming P.DEEPAN Complaint Date 4/7/2015
Supplier ASB TOOLS Closing Date
Occurrence First Time Second time Repeated
Problem Source Incoming Inprocess Invioce No & Date 26/03/2015 & 06/04/2015
Disposition Corrective action
Notice Available Stock in SIP - 6560 No's
Report
Closed or Pending Closed Pending Receving Date 14/12/2014
Subject Window display ejection pin Projection Observed.
OK PART NG
C-2
C-1
100% Ejection Pin Projection Observed in Cavity No - 1.
OK PART. NG PART (GATE POINT PROJECTION)
PREPARED BY, P.DEEPAN APPROVED BY, N.SHIVAKUMAR
Root Cause : ( Tools used for root cause )
Why - Why Cause & effect Others
Temporary Corrective action :
Permanent corrective action :
Target date :
SIP Quality Assurance Prepared By: Checked By: Approved By:
Review Standard
Corrective action Verification at Inhouse Verification Report : (If necessary attached)
Name: Verified By: Verified Date: Inspec Std Others
QIR Effectiveness monitoring
Sl.No Date Lot Qty Status Verified By Approved By
1
Closed
2
Pending
3
REMARKS:
At the Sampling time find out like this part, & Customer end Alo facing Many Problem Regarding this issue. Already Informed this issue to ASB Quality Team But
Still We are getting part like this.
SIP-QC-13
S e
i n
g CHAR P/ T/ d
G/
n GE L L Li
NON CONFORMANCE REPORT x
6
To : Ref.No / Date NC/OCT/001
Part No
Part Name
Model
D.C/ Invoice
Attn: Quality manager
No./Date
Type of problem
Incoming line Inprocess Customer
Problem / Defect Details Qty Affected Sketch (If required)
Unit cost in RS Total cost in RS
Action on defective parts in DSC
New problem Accepted concessionally
Segregated
To be reworked Return to supplier
Repeated problem
Scrapped
Repeated after improvement
Action Required
Reply in C/Measure format with in 3 Days
PREPARED CHECKED APPROVED
Please call on us SIGN
Rework / Segregation immediately
P DEEPAN LAWRANCE H GOPINATH
Effectiveness of Corrective Actions : (Status of next 3 lots checked at SPL)
Status of lot (O.K Nature of defects
S.No. GRN No./ Date
/ Not O.K) (If any)
Sig. Improvement Status
Pending
1
In process
2 Completed
Effectiveness Reviewed by
3