Daily Progress Report

The daily progress report provides information on the RMZ Centennial project including the contractor, duration in days, site location, contract start and completion dates, weather conditions, planned and achieved activities for excavation, formwork, concrete work, masonry and other tasks. It also includes details on manpower, materials received and consumed, and any constraints. The report is prepared by the construction manager to track daily work progress.

Uploaded by

kprasad_56900
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
91% found this document useful (32 votes)
56K views1 page

Daily Progress Report

The daily progress report provides information on the RMZ Centennial project including the contractor, duration in days, site location, contract start and completion dates, weather conditions, planned and achieved activities for excavation, formwork, concrete work, masonry and other tasks. It also includes details on manpower, materials received and consumed, and any constraints. The report is prepared by the construction manager to track daily work progress.

Uploaded by

kprasad_56900
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

LARSEN & TOUBRO LTD.

,ECCD PROJECT QUALITY PLAN

DAILY PROGRESS REPORT


DATE:FORMAT NO. QAF/DPR/20 REV NO.00

QUALITY MANAGEMENT
Name of Work : Employer : Contractor : Dur. in Days:
SITE

RMZ CENTENNIAL

PROJECT

Contract Start Date


Contract Completion

Total Rainy
LOCATION
From :

Elapsed
To :

Balance Site Conditions:


FOR THE DAY

Normal Day
ACTIVITY DESCRIPTION

Slushy
PL. NEXT DAY Cum Achieved

Dry
% COMP

UNIT TOTAL QTY.

PLANNED

ACHIEVED

EXCAVATION BACKFILLING FORMWORK PCC REINFORCEMENT WORK PROGRESS RCC BLOCKWORK BRICKWORK SSM PLASTER WATER PROOFING

MAN POWER
DESCRIPTION PLANNED ACTUAL DESCRIPTION UNIT

MATERIAL
RECEIPTS FOR DAY TILL DATE CONSUMPTION FOR DAY TILL DATE

LABOUR & MATERIAL


TOTAL

Distribution

Prepared by:

Construction manager

CONSTRAINTS